True experts in deep wells
Benefits
Own installation and maintenance team
Involvement in high-quality biddings
We have a marketing branch in Monterrey
Solid and
trustworthy company
We have detailed technical sheets
Customized quotes according to your projects
Home delivery
Our numbers provide certainty
Certifications
We do more than necessary for the satisfaction of our clients, that is why our staff is trained and specialized in:
Repairs
Installation
Start-up and operation
Calculation and selection
Certifications
Only the best brands
Services
Equipment acquisition
Equipment acquisition
We arrive at the site with all the specialized equipment to perform the installation. Once the crane is placed, we make the coupling of the pump with the motor, apply the waterproof wiring tie, and then install the pump, then the tubing, along with the cable, until we reach the discharge head. Once all this is done, we start the equipment for the first time to ensure that everything is working correctly. We verify rotation, water flow, electrical values, and dynamic level.
Previous requirements
Well diameter
ADEME (casing) diameter
Operation’s voltage
Work water flow
Well levels
This is the process to be performed
Supply
Cable and tubing
Valves
Tubing
Electrical starter
Discharge train
Start-up and operation
Electrification
Renewable energy
Diagnosis
Pumping capacity
It helps to identify the amount of water produced by the well as well as the depth of its drawdown. We do this by pumping at a controlled speed for 24, 48 or 72 hours. At the end we deliver the tabulated and graphed results.
Previous requirements
Well diameter
Diameter of the discharge tubing
Total depth
of the well
This is the process to be performed
Installation of submergible moto pump
Equipment start-up
Flow measurement
Level measurement
Delivery of results
Diagnose
Video recording of wells
To have real and certain information on the conditions of a well, video inspection with a specialized camera is necessary, which will allow us to evaluate and identify problems in its structure, such as collapses of different kinds and we can even observe if the grooves in the ADEME (casing) are clogged with embeddings formed by minerals inside and we can determine the static water level (water surface).
Previous requirements
Diámetro del pozo
ADEME (casing) diameter
Location of the well
This is the process to be performed
Installation of the chamber
Video recording of the well
Delivery of results and recording
Automation and pumping system
Automation of deep wells
We install the control panel, then we install the protections for both the well and the final point. Then we will install filling valves (if necessary) and finally, we perform the equipment tests and begin the start-up.
Previous requirements
Horsepower
Available voltage
Tubing diameter
Variable to control
Number of pumps
This is the process to be performed
Board installation
Installation of sensors
Installation of valves
Floats
Automation and pumping system
Automation of the pumping system
We insert the equipment in the control room, then we do the power supply wiring (on the switch and motor pump side). We install a pressure sensor (depending on the variable that you want to control). Then we program the frequency converter to your needs and then we finish by performing functional tests and the start-up.
Previous requirements
Voltage in operation
Motor’s horsepower
Transformer’s capacity
Defined variable to control
This is the process to be performed
Insertion
Entry and exit wiring
Programming
Start-up and operation
Automation and pumping system
Installation of control boards
We install the components of each board in our Authorized Service Facility according to the highest quality standards and complying with the technical requirements, for example: NEMA enclosure or IP requirements, protection against transients, corrosive, marine environments, among others
Previous requirements
Horsepower
Voltage
Tubing diameter
Variable to control
Number of pumps
This is the process to be performed
Insertion
Entry and exit wiring
Programming
Start-up and operation
Automation and pumping system
Repumping of clean and wastewater
We install the equipment to re-pump clean water or wastewater, then we automate it through a control board, where level “pears” are used as protection and automation. Finally, we perform tests and start the equipment.
Previous requirements
Horsepower
Voltage
Tubing diameter
Water type
Number of pumps
This is the process to be performed
Installation of equipment
Board automation
Installation of sensors
Tests
Start-up and operation
Special services
Protection and retrieval of equipment
We uninstalled the pumping equipment and then made a video recording to inspect the conditions of the well. Subsequently, we identify the damaged areas and proceed to repair them by means of a casing protection. This process lasts 3 days (depending on the meters to be repaired). We make a video recording again to ensure the optimal repair of the water well. The procedure is completed by installing the pumping equipment and begin start-up.
Previous requirements
Uninstallation of equipment
Video recording
This is the process to be performed
Uninstalla-tion of equipment
Initial video
Protection
Final video
Installation of the pump equipment
Start-up and operation
Special services
Disinfection
Disinfection is an important stage within the water treatment process. It helps in the effective destruction of pathogenic microorganisms. It is not toxic for humans or pets (at the used doses), it is non-toxic for aquatic and plant species (at the used doses); it produces ease and safety in storage, transportation and operation, stability over time for the active substance, an easy and reproducible analysis of concentration in water; it provides residual protection in the water during distribution (stability of the residual for hours/days), it eliminates biofilms from the tubing (at the used doses).
We verify the following factors that may affect this procedure:
- Biolayers in the tubing: impact on the ability of disinfection and cross-contamination of product biolayers.
- Corrosion inside the layer.
- Chemical composition of water: it could be organic matter (natural or microorganisms) or inorganic matter (iron, magnesium, nitrates, arsenic). Disinfection can be applied through these systems: physical: radiation, UV, ultrafiltration; chemical: ozone, chlorine gas, sodium hypochlorite, chlorine dioxide.
Previous requirements
Product and attributes to disinfect
This is the process to be performed
Hydraulic and electrical installation of the equipment
Start-up and operation
Special services
Dosage
The dose regulating pump provides an exact specific flow from one liquid to another fluid (hazardous, concentrated, degassing or highly viscous liquids) over an established period of time. It represents low costs in energy, pump life cycle and maintenance.
Previous requirements
Product dose to be regulated
Flow to be regulated
Pressure
Voltage
This is the process to be performed
Hydraulic and electrical installation of the equipment
Start-up and operation
Special services
Electrification
We have 3 services in the field of well electrification.
Power Supply in Medium Voltage Networks
We improve the distribution of electrical energy; to achieve this we generate a process in which the following is carried out: overhead lines, transitions, power supply to underground and overhead substations.
Electrical
Substations
We establish the adequate levels for the transmission and distribution of electrical energy; to do this we provide supply and installation as well as maintenance of pole and pedestal type transformers. We also design compact substations.
Emergency Plants:
We provide solutions in power supply for heavy duty applications and jobs; for this we have rental and sale of emergency plants completely designed to your needs.
Maintenance
Energy quality study
Upon entering the facilities, we connect different sensor types to the equipment, in order to monitor all electrical values for 3 consecutive days. Once these tests have been performed, we deliver a report with graphs and provide recommendations for improvements
Previous requirements
Availability of installations
This is the process to be performed
Sensor installation
Monitoring
Delivery of results
Maintenance
Maintenance of pumping equipment
At our Authorized Service facility, we perform tests on the pumping equipment and with the diagnosis we perform repair or maintenance tasks to guarantee optimal performance.
Previous requirements
Uninstallation of equipment*
Analysis of installations
*Cost not included in the maintenance service
This is the process to be performed
Electrical tests and disassembly
Assembly
Repair or maintenance
Reinstallation
Maintenance
Restoration of wells
We perform a video evaluation and then apply chemicals for deep cleaning of the well (descaling of rust and scale from the ADEME (casing) pipe). Continuing with the vertical brushing of the well installations, we uncover the well veins and finally we "spoon" all the dirt found at the bottom of the water well. We deliver the results and video recording.
Previous requirements
Diameter
Total depth of the well
Well ADEME (casing) location and material
This is the process to be performed
Application of descaling chemicals
Brushed
Spooning
Pistoning
Desilting
Final video
Project delivery
Perforation
Perforation
We evaluate the terrain through geological studies carried out by experts in the field. This geothermal mapping allows us to know the depth at which the water tributary is located. We determine the best location to make the perforation of the water well and then we make the perforation using the most advanced equipment according to the type of terrain material. Once done, we apply the ADEME (casing) and gravel. Finally, we generate a video recording of the facilities.